Product
Supplier
Encyclopedia
Inquiry
Home > News > Paint & Coating News > Xinjiang Tianye Tianneng calcium carbide actively plays the 'four Preventions'

Xinjiang Tianye Tianneng calcium carbide actively plays the 'four Preventions'

ECHEMI 2019-10-21

painting-tool

Recently, the temperature has dropped sharply. In order to ensure the normal operation of production equipment, Peng Jiangwei, deputy general manager of Tianye Tianneng. Calcium CarbideCompany in Xinjiang, made a clear request at the company dispatching meeting that all workshops should strictly implement the objectives of "freeze prevention, fire prevention, poisoning prevention, snow prevention" in winter, so as to ensure the smooth operation of production and work, and set about "four preventive measures" in winter. Strengthen organizational leadership and focus on implementation.

Each workshop clearly defines its own work responsibilities and refines the measures for the work of "four preventions" in winter: formulates detailed plans for power supply, water supply, heating and other systems to do a good job of anti-freezing work; takes necessary anti-freezing and anti-freezing protection measures for equipment and pipelines; and divides the responsibility of the plant area so as to clean up snow and rainwater in time. To ensure skid-proof work, strict requirements are made for staff lounges, offices and cooling shed in various workshops, and specific measures are formulated to do a good job in the work of "four preventions" in winter. Investigation and management of hidden dangers, so as to prevent dangers in the future.

Under the leadership's high attention, the equipment personnel of each production workshop carried out hidden danger investigation on the dynamic and static equipments on the spot, found problems and rectified them in time and eliminated hidden dangers; in view of the characteristics of the field equipments of each production workshop, formulated a reasonable drainage and freeze-proof scheme, thoroughly drained the accumulated water in the furnace and gas pipelines of each workshop, without any dead corner, and weighed the parts where water might be stored. Point check, no residue allowed. Each workshop designates a special person to carry out anti-freezing inspection to ensure that one equipment, one pipeline and one valve are not frozen out in winter, and all the workers are mobilized to grasp the joint pipe and do a good job of anti-freezing and heat preservation.

Disclaimer: ECHEMI reserves the right of final explanation and revision for all the information.

Looking for chemical products? Let suppliers reach out to you!

Comment
Comment

Trade Alert

Delivering the latest product trends and industry news straight to your inbox.
(We'll never share your email address with a third-party.)

Scan the QR Code to Share

Feedback & Suggestions
Send Message

Thank you for your feedback. If you require further assistance, please contact us by email at info@echemi.com or call us at +86-532-55729510.