Product
Supplier
Encyclopedia
Inquiry
Home > Pharmaceutical Intermediates > Bulk Drug Intermediates > Semaglutide for Sale > Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available
Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available buy - large image1
Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available buy - image1
Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available buy - image2
Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available buy - image3
Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available buy - image4
Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available buy - image5
Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available buy - image6

Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available

TDS 479 Inquiries

Unit Price:

$34-40/UNIT EXW

Get Latest Price
CAS No.:

910463-68-2

Grade:

Pharmaceutical Grade

Content:

99%

Port:

hebei

Brand:

SDR

Packaging:

Bottled

Price valid (until):

2027-05-31

Company Type:
Trader
Location:
China
Payment Terms:
TT against copy of documents,TT against B/L draft before shipment,100% TT in advance
Average Lead Time:
3 days
Qualification:
Main Products:

peptides,Semagiutide,Retatrutide,GHK-CU,MOTS-c,Semax

  • Product Description

  • Seller Information

  • Inquiry History

  • Description


      Product Introduction  


    Items Specifications
    Packaging method Bottled
    Purity 99%
    Product abbreviation SM
    Dosage 15mg*10vials

    Semaglutide is a GLP‑1 receptor agonist. It stimulates insulin secretion in a glucose‑dependent manner, suppresses glucagon release, slows gastric emptying and reduces appetite. Clinically indicated for glycemic control in type 2 diabetes mellitus, chronic weight management, and reduction of cardiovascular risk in eligible patients.




      Company Profile


    We are a high-tech enterprise dedicated to the research and development of innovative peptide compounds, customized synthesis and supply of scientific research raw materials. We are deeply involved in the fields of peptide chemical synthesis, purification processes and quality analysis, providing high-quality peptide research raw materials and technical support services to domestic and foreign university laboratories, pharmaceutical research institutions and CRO enterprises.
    The company has gathered professional technical teams specializing in peptide synthesis, analysis and testing, and process development. It has established a complete peptide synthesis laboratory, purification platform and quality control testing system, and possesses the capacity for large-scale preparation of long-chain peptides, modified peptides and novel target peptides. It can provide integrated technical support including solid-phase synthesis, liquid-phase synthesis, chromatographic purification, structural characterization and stability research.
    The core scientific research raw material product line covers GLP-1-related target peptides and various innovative active peptide intermediates, among which Retatrutide (LY3437943) is a scientific research grade peptide raw material. All products are for in vitro scientific research and experimental use only. They must not be used for human trials, clinical drug administration, medical aesthetics or any diagnostic or therapeutic purposes.
    The company has established a standardized quality control process. Each batch of raw materials is accompanied by HPLC purity testing and MS mass spectrometry structure verification reports, strictly controlling key indicators such as purity, impurities, and moisture. We can provide services such as repackaging in different specifications, customized synthesis, and process optimization, supporting the experimental needs of research institutions for the early-stage pharmacological research and mechanism exploration of new drug targets.
    Since its establishment, the enterprise has adhered to the concept of compliant operation, strictly abided by relevant laws and regulations on pharmaceutical research and development, and established long-term and stable cooperation with many domestic universities and drug research and development laboratories. With stable product quality, efficient delivery capabilities and professional technical consulting services, we support the basic research of innovative metabolic target drugs and continuously provide reliable raw material support for global peptide basic scientific research.


    Business philosophy


    Focus on the innovative research and development of peptides, strictly adhere to the boundaries of scientific research and application, prioritize quality, and achieve win-win results through integrity

    Contact information





    Email: 1060575270@qq.com

    W hatsapp:+852 5976 3637


      Product display 


    Shop Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available-Detailed Image 1 Shop Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available-Detailed Image 2 Shop Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available-Detailed Image 3 Shop Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available-Detailed Image 4 Shop Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available-Detailed Image 5 Shop Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available-Detailed Image 6 Shop Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available-Detailed Image 7 Shop Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available-Detailed Image 8 Shop Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available-Detailed Image 9 Shop Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available-Detailed Image 10  Shop Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available-Detailed Image 11 Shop Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available-Detailed Image 12 Shop Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available-Detailed Image 13 Shop Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available-Detailed Image 14 Shop Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available-Detailed Image 15



    Mode of transportation  


    Air transport, using federal or postal express delivery

    ECHEMI Editorial Reference

    Semaglutide (CAS: 910463‑68‑2) is a synthetic lipid‑modified peptide analogue, consisting of a 31‑amino‑acid backbone with a covalently attached C18 fatty di‑acid side‑chain via a hydrophilic spacer. It shares 94% amino‑acid sequence homology with native human GLP‑1 peptide. The substance appears as white to almost white hygroscopic powder, with molecular formula C₁₈₇H₂₉₁N₄₅O₅₉ and molecular weight of 4113.58 g/mol. Structural modifications grant it resistance against DPP‑4 enzymatic degradation and enable reversible binding to serum albumin, contributing to its extended in‑vivo half‑life property.

    Certificates
    • Struggling with Long Lead Times? Reliable Bulk & Small-Batch Semaglutide Available Certificates 1 TDS

    Basic Info
    Product Name:

    Semaglutide

    Other Name:

    Sermaglutide;Semaglutide impurity;Sermaglutide USP/EP/BP;semaglutide;Sermaglutide CAS 910463 68 2;Semaglutide (H-7894.0001);semgalutide;Semaglutide

    CAS No.:

    910463-68-2

    Molecular Formula:

    C187H291N45O59

    InChIKeys:

    DLSWIYLPEUIQAV-CCUURXOWSA-N

    Molecular Weight:

    4113.57754

    Exact Mass:

    4113.122087 g/mol

    EC Number:

    203-405-2

    Color/Form:

    White to off-white

    Characteristics
    PSA:

    1650 Ų

    XLogP3:

    5.44520

    Critical Temperature & Pressure:

    Store at -20°C

    Research
    Class:

    GLP-1R agonist

    Status:

    FDA-approved (Ozempic / Wegovy / Rybelsus)

    Mechanism:

    Long-acting, selective glucagon-like peptide-1 (GLP-1) receptor agonist with 94% sequence homology to human GLP-1. Engineered for extended half-life (~1 week) via albumin binding (fatty acid acylation at Lys26) and resistance to DPP-4 degradation (Aib substitution at position 8). Promotes insulin secretion, inhibits glucagon release, delays gastric emptying, and reduces appetite via central nervous system GLP-1R activation.

    Activity note:

    Potent, selective GLP-1R agonist. Reported binding affinity Ki = 0.38 ± 0.06 nM. Semaglutide is a human GLP-1 analog with structural modifications for albumin binding (C18 fatty diacid at Lys26) and enzymatic stability (Aib8 substitution).

    Source:

    Lau J, et al. J Med Chem. 2015;58(18):7370-7380. Wilding JPH, et al. N Engl J Med. 2021;384(11):989-1002.DOI

    Clinical Development:

    NCT03548935; NCT03552757; NCT01720446; NCT02692716

    FDA:

    Ozempic, Wegovy, Rybelsus (approved 2017-12-05)

    References
    ChEMBL:

    CHEMBL2108724

    DrugBank:

    DB13928

    KEGG DRUG:

    D10025

    PubChem:

    PubChem

    Disclaimer:

    Semaglutide is approved as a prescription medicine (Ozempic, Wegovy, Rybelsus) in certain jurisdictions. This listing is for industrial and laboratory research use only. Research-chemical listings on B2B marketplaces are not interchangeable with approved medicines. Confirm CAS, specification, and regulatory pathway with the seller. It is not medical advice, a clinical recommendation, or an approved therapy description.

    Hazard Identification

    Classification of the substance or mixture

    Reproductive toxicity, Category 2

    GHS label elements, including precautionary statements

    Pictogram(s)
    Signal word

    Warning

    Hazard statement(s)

    H361 Suspected of damaging fertility or the unborn child

    Precautionary statement(s)
    Prevention

    P203 Obtain, read and follow all safety instructions before use.

    P280 Wear protective gloves/protective clothing/eye protection/face protection/hearing protection/...

    Response

    P318 IF exposed or concerned, get medical advice.

    Storage

    P405 Store locked up.

    Disposal

    P501 Dispose of contents/container to an appropriate treatment and disposal facility in accordance with applicable laws and regulations, and product characteristics at time of disposal.

    Other hazards which do not result in classification

    no data available

    Handling and Storage

    Precautions for safe handling

    Handling in a well ventilated place. Wear suitable protective clothing. Avoid contact with skin and eyes. Avoid formation of dust and aerosols. Use non-sparking tools. Prevent fire caused by electrostatic discharge steam.

    Conditions for safe storage, including any incompatibilities

    Store the container tightly closed in a dry, cool and well-ventilated place. Store apart from foodstuff containers or incompatible materials.

  • Seller Information
    Business Type:

    Trader

    Main Products:

    peptides,Semagiutide,Retatrutide,GHK-CU,MOTS-c,Semax

    Location:

    Units 1503-14, 15th Floor, New HNA Building, No. 7 Guoxing Avenue, Lantian Subdistrict, Meilan District, Haikou City, Hainan Province

    Payment Terms:

    TT against copy of documents,TT against B/L draft before shipment,100% TT in advance

    Average lead Time:

    3 days

    Total Annual Revenue:

    $2.5 million-$5 million

    Total Employees:

    101-200

    Year of Establishment:

    2025

  • Inquiry History
    479 Inquiries
    Country Product Purchase Quantity Date Posted
    United States

    Weight Loss Semaglutide intermediate 99% White powder COA High Quality peptide GLP-1 910463-68-2

    5 MG Apr 11, 2024
    United States

    Gene-Biocon Semaglutide 910463-68-2 GLP-1analogs diabetes weight loss 96% White or off-white powder

    2  Dec 5, 2023
    United States

    Semaglutide 910463-68-2

    1 G Sep 21, 2023
    China

    Semaglutide CAS 910463-68-2

    1 KG Apr 16, 2026
    United States

    Sermaglutide 99% 910463-68-2

    2 KG Oct 21, 2023
    United Kingdom

    TGYFactory Supply Semaglutide Peptide 99% CAS 910463-68-2

    50 MT Nov 13, 2023
    Sri Lanka

    Bulk Supply 98% up Sermaglutide powder CAS 910463-68-2

    300 G Nov 18, 2023
    United States

    Semaglutide Ozempic Sermaglutide 99.9% white powder 910463-68-2 Teruiop

    500 G Oct 9, 2023
    United States

    Raw mateiral Semaglutide CAS 910463-68-2 99% White powder

    1000 G Sep 23, 2023
    United States

    10MG vial pack Semaglutide 99% 910463-68-2 GLP-1 Peptide

    10 MT Oct 18, 2023
    United States

    High Purity IGF-1 LR3 Peptide CAS 910463-68-2 IGF1 LR3

    60 MG Aug 4, 2025
    China

    Semaglutide Tirzepatide for Weight Loss CAS: 910463-68-2 Retatrutide Cagrilintide

    1 MT Jul 5, 2025
    United States

    High Purity IGF-1 LR3 Peptide CAS 910463-68-2 IGF1 LR3

    10 MT Sep 19, 2025
    United States

    High Purity IGF-1 LR3 Peptide CAS 910463-68-2 IGF1 LR3

    2  Nov 13, 2024
    United States

    semaglutide CAS 910463-68-2 in stock 2-4 days safe delivery

    1 MT Nov 4, 2023
    United Kingdom

    API Pharmaceutical Chemical Grade Raw Materials CAS 910463-68-2 Semaglutide

    40 MT Sep 27, 2023
    United States

    High Purity IGF-1 LR3 Peptide CAS 910463-68-2 IGF1 LR3

    10  Sep 27, 2023
    India

    Best Price 99% Semaglutide Peptide 10mg Vials Semaglutide CAS 910463-68-2

    100  Nov 8, 2023
    United Kingdom

    Manufacturer supply high purity Semaglutide 98% with best price cas 910463-68-2

    100 MT Sep 22, 2023
    United Kingdom

    Manufacturer supply high purity Semaglutide 98% with best price cas 910463-68-2

    10 MT Nov 14, 2023
    Post an enquiry for this product
pic ×

Scan the QR Code to Share

All products displayed on this website are only for non-medical purposes such as industrial applications or scientific research, and cannot be used for clinical diagnosis or treatment of humans or animals. They are not medicinal or edible.

According to relevant laws and regulations and the regulations of this website, units or individuals who purchase hazardous materials should obtain valid qualifications and qualification conditions.

The information shown above is provided by the enterprise itself, and the authenticity, accuracy and legitimacy of the content are the responsibility of the publishing company. ECHEMI does not bear any guarantee responsibility for this. Please be aware that risks in internet transactions objectively exist.

Feedback & Suggestions
Send Message

Thank you for your feedback. If you require further assistance, please contact us by email at info@echemi.com or call us at +86-532-55729510.