Product
Supplier
Encyclopedia
Inquiry
Home > News > Company Dynamic > Wanhua Chemical Restructures

Wanhua Chemical Restructures

ECHEMI 2023-11-30

On November 29, the Meishan Municipal Ecological Environment Bureau plans to make an approval decision on the environmental impact assessment document of Sichuan Wanlu Industrial Co., Ltd.'s PVDF integrated project with an annual output of 20,000 tons and make it public.

 

Wanhua Chemical (Sichuan) Co., Ltd. is a wholly-owned subsidiary of Wanhua Chemical Group Co., Ltd. It was established in July 2014 with a registered capital of RMB 100 million. Wanhua Company established the Wanhua Sichuan Industrial Park (a non-independent park, belonging to Wanhua Company’s industrial cluster in the park) in the west area of Meishan High-tech Industrial Park in Sichuan Province, and has successively implemented 250,000 tons of high-performance modified resin projects (production), biodegradable polyester project with an annual output of 60,000 tons (production), lithium battery ternary material project with an annual output of 10,000 tons (production), natural gas acetylene industry chain and park supporting public and auxiliary engineering projects (production), etc.

 

Relying on the acetylene resources reserved by Wanhua Company's "Natural Gas to Acetylene Industrial Chain and Park Supporting Public Engineering Project", Wanlu Company plans to invest 1.3 billion yuan to implement an integrated PVDF project with an annual output of 20,000 tons in Meishan High-tech Industrial Park. The land used for this project is the reserved industrial land rented by Wanhua Company in Wanhua Sichuan Industrial Park, and some public auxiliary facilities are based on existing projects and facilities under construction in Wanhua Sichuan Industrial Park.

 

Project name: PVDF integrated project with an annual output of 20,000 tons

 

Nature of construction: reconstruction and expansion

 

Construction location: Meishan High-tech Industrial Park, Sichuan Province

 

Total project investment: 1.3 billion yuan

 

Covered area: about 131 acres, reserved industrial land (vacant land) rented from Wanhua Company

 

Main construction content and scale: The construction content of this project includes a 20,000 tons/year PVDF device, a 30,000 tons/year R152a device, a 40,000 tons/year R142b device and its supporting public and auxiliary facilities; the operation time of the production device is 8,000 hours/year, it usually operated in four shifts and two shifts.

 

The project is constructed in two phases. The first phase has a production capacity of 10,000 tons/year of PVDF products, and the second phase has a production capacity of 10,000 tons/year of PVDF products.

Disclaimer: ECHEMI reserves the right of final explanation and revision for all the information.
Company-Dynamic
Comment
Comment

Trade Alert

Delivering the latest product trends and industry news straight to your inbox.
(We'll never share your email address with a third-party.)

Scan the QR Code to Share

Feedback & Suggestions
Send Message

Thank you for your feedback. If you require further assistance, please contact us by email at info@echemi.com or call us at +86-532-55729510.