Product
Supplier
Encyclopedia
Inquiry
Home > News > Paint & Coating News > Another important device of Guangxi Huayi 200,000 tons/year bisphenol A project is topped

Another important device of Guangxi Huayi 200,000 tons/year bisphenol A project is topped

ECHEMI 2021-10-18

On October 7, the phenol acetone plant of the 200,000 tons/year bisphenol A project of Guangxi Huayi New Materials Co., Ltd., which was contracted by Shanghai Engineering Company, realized the topping of the frame civil structure.

 

The construction of the civil frame of the phenol acetone plant is the key line of the project schedule. There are 3 concrete frames (frame A1, frame A2 and frame D), of which the highest point of the A2 frame is 40.6 meters, with a high formwork height, a large amount of load-bearing scaffolding and pre-embedded The characteristic of large number of pieces involves the preparation and expert demonstration of the construction plan of tall formwork and load-bearing system.

 

Prior to this, on September 10, the Guangxi Huayi New Materials 200,000-ton/year bisphenol A project contracted by Saiding Company EPC held a framework capping ceremony for the production area, which was completed 20 days earlier than originally planned.

Disclaimer: ECHEMI reserves the right of final explanation and revision for all the information.

Looking for chemical products? Let suppliers reach out to you!

Comment
Comment

Trade Alert

Delivering the latest product trends and industry news straight to your inbox.
(We'll never share your email address with a third-party.)

Scan the QR Code to Share

Feedback & Suggestions
Send Message

Thank you for your feedback. If you require further assistance, please contact us by email at info@echemi.com or call us at +86-532-55729510.